ABIC delivered a new 5500 m² staff car park at Bacchus Marsh Grammar’s Woodlea campus, with space for 121 vehicles. The scope spanned bulk earthworks, pavement construction, and drainage, power and comms infrastructure. It also included landscaping, perimeter fencing, automated access gates, signage and line marking.
Days into construction, extensive rock was discovered across the site, requiring substantially more excavation and removal than anticipated. With a critical completion date to meet, ABIC accelerated the programme, bringing in additional resources, extending working hours and continuing on site through the Christmas shutdown.
Those measures recovered the time lost to the rock, and the car park was ready for the start of the school year.